| projnum_a |
vnname |
m2 |
sumcontr |
projtitle |
projaddres |
team |
projnum_b |
projnum_c |
mps |
pct |
multicd |
cprojion |
dprojion |
astat |
bstat |
cstat |
dstat |
estat |
fstat |
inspectr |
contractor |
chrcode |
am |
is |
asofmonth |
| 00052-111 |
Vista Systems |
C |
8265 |
COSME WTP DETROIT GENERATOR REPLACEMENT |
16015 Racetrack Road, Odessa, FL 33566 |
30 |
00052-111 |
00052-111 |
P |
100 |
0 |
04/08 - Process Work Order 04/08 - Award Contract 05/08 - Issue NTP 06/08 - Begin Construction |
|
RFP sent out. October - NTP in
process for basis of design report.ŤŠJune 2002 - Design continues.ŤŠMay 27, 2003 - Revised scope and workorder and
workorder amendment out for approval.ŤŠAugust 21, 2003 - City Council
approves Task Order 00-01-TBE with |
Tampa Bay Engineering, Inc. in the lump sum amount of $12,138 for
additional design improvements and upgrades to the
generator and generator building for generator no. 2. December 2004 - Project
to be bid with roof replacement and S.C.B #6 project. |
Five (5) sets of plans & specs sent to Gail O. on 5/24/06 per R.
Voakes for review of possible reactivation of
project. Project close out. Received revised Task Order for additional
services 11/9/06. 12/06 Workorder Amendment approval. |
|
|
|
Consultant |
|
200 |
A |
D |
March |
| 02083-111 |
Black & Veatch Corporation |
D |
497600 |
OBERLY PUMPING STATION - DESIGN |
6198 - 66 S/N |
30 |
02083-111 |
02083-111 |
P |
100 |
0 |
06/08 - Prepare for Advertisement
07/08 - Advertise 08/08 - Open
Bids |
|
July 2003 - Recevied draft report.
September 2003 - Draft report received. May 4, 2004 - Final Basis of Design Report (BODR) received. August 27, 2004 - Revised Task Order
distributed. January 2005 - Issue
Notice to Proceed (NTP) for additional serv- |
ices (design) to Black & Veatch.
July 21, 2005 - Council award to Revere. 3/06 Cosme change to increase the scope of work. Awaiting schedule from consultant. 7/05/06 Received final plans/specs. 7/06 Pre-bid advertisement. 8/06 ON HOLD to bid with |
generator project. 10/06 thru
11/06 Complete write-up for generator and seek City council approval. Investigating a prepurchase of three (3) generators
(WT, Oberly, Cosme) Bid three together. Collecting data on generators to
support sole source purchase |
10/06 Prepare Generator Direct Purchase Documents. |
|
|
|
|
420 |
A |
D |
March |
| 03064-111 |
Black & Veatch Corporation |
D |
344700 |
WASHINGTON TERRACE PS - GENERATOR #1 SWITCHGEAR MCC VFD ADDITION REPLACEMENT |
2801 - 66 A/N |
30 |
03064-111 |
03064-111 |
P |
100 |
0 |
06/08 - Prepare for Advertisement
07/08 - Advertise 08/08 - Open
Bids |
|
July 2003 - Recevied draft report.
September 2003 - Draft pump
curve report received. Met with team to determine
quantity of generators. May 4, 2004 -
Final Basis of Design Report (BODR) received.
August 27, 2004 - Revised Task Order distributed. |
7/05/06 Received final plans/specs.
7/06 Pre-bid advertisement.
8/06 ON HOLD to bid with generator project. |
9/06 thru 11/06 Complete write-up for generator and seek City council
approval. Investigating a prepurchase of three (3)
generators (WT, Oberly, Cosme) Bid three together. Collecting data on
generators to support sole source purchase. 10/06 Prepare |
Generator Direct Purchase Documents. |
|
|
|
|
420 |
A |
D |
March |
| 04056-111 |
McKim & Creed Engineers |
D |
103111 |
COSME WTP HEADER AND SEQUENCE VALVES REPLACEMENT |
16015 Racetrack Road, Odessa, FL 33566 |
30 |
04056-111 |
04056-111 |
P |
100 |
0 |
03/08 thru 06/08 - Evaluate Re-bidding/Modifying Scope |
|
August 27, 2004 - 95% plan set distributed. McKim & Creed providing additional site
visits to monitor actuator open/close times. Will
also modify construction sequence to minimize operatioal impact to plant.
10/06 Finalize Design. |
|
|
|
|
|
|
|
420 |
A |
D |
March |
| 04069-111 |
Greeley and Hansen Engineers |
D |
49000 |
US 19 - WHITNEY RD TO SR 60 OVERPASS - 48" WTM RELOCATION |
US19 from Whitney Road to SR60 overpass |
18 |
04069-111 |
04069-111 |
P |
100 |
0 |
Project Close Out in Progress |
|
May 2004 - 30% Plans sent to utility check. June 2004 - Letter to
adjoining property owners for easement request.
July 2004 - Requested additional
As-Builts from FDOT thru Lochner. Septembe 2004 - Obtained additional FDOT
utility information. |
Schedule and cost estimate profile sent to Water Resources. November 2004
- Route alignment study from G&H received.
December 2004 - G&H proposal to WR for review and approval. February 2005
- Received 15% plans. March 2005 -
Review FDOT 30% plans. NTP |
to G&H for study. June 3, 2005 - G&H alignment study to
Water Resources for review. June 2005 - Work order
to Water Resources for easement acquisition.
2/06 Start field survey. Choose best alignment for 36" &
48" WTM relocations. Obtain FDOT letter on |
US 19 alignment for 48" WTM and meeting with Marine Max. 3/06 Meet with Water Resources to choose and alignment.
4/06 City Council approval, NTP to G&H. 4/06 Meetings with adjoining property
owners on 36" WTM. 6/29/06 Meeting
scheduled with adjoining |
property owners on 36" WTM.
6/06 Recommend alignment to WR after receiveing SUE data from FDOT. JPA
Agreements and TSP submittal to FDOT for approval. Marine Max &
Harborside have agreed to provide Temporary Construction Easement (TCE) at no
cost for |
36" relocation. FDOT have agreed to provide and easement at Don
Pablos for the 36" relocation. Marine Max will not provide an easement for 48"
relocation. |
|
|
420 |
A |
D |
March |
| 05046-111 |
Greeley and Hansen Engineers |
D |
368065 |
COSME WTP GROUND STORAGE TANK AND VALVE REPLACEMENT |
16015 Racetrack Road, Odessa, FL 33566 |
07 |
05046-111 |
05046-111 |
P |
95 |
0 |
04/08 - Prepare 100% Design 05/08
- Submit 100% Design 06/08 - Submit
for Permits 07/08 - Finalize Bid Documents |
|
January 14, 2005 - Kick-off meeting.
April 1, 2005 - Preliminary PDR received. April 29, 2005 - Preliminary PDR review meeting. September 2, 2005 - Draft PDR review
meeting. 10/06 Request Design Proposal from G&H. |
|
|
|
|
|
|
|
420 |
A |
D |
March |
| 06046-110 |
Marine Contracting Group, Inc. |
C |
78000 |
ARTERIAL CHANNEL C DREDGING |
Eckerd College Area |
30 |
06046-110 |
06046-110 |
P |
1 |
0 |
Continue Dredging |
|
1/06 Complete survey and seagrass mapping. 2/06 Permit pre-application meeting. 4/06 Permit application;
FDEP, ACOE and PCWNA. 10/06 Finalize Permits. |
|
|
|
|
|
Tony Corson |
Marine Contracting Group, Inc. |
200 |
A |
C |
March |
| 06076-111 |
Greeley and Hansen Engineers |
D |
122500 |
COSME HIGH SERVICE PUMP & PLANT INSTRUMENTATION UPGRADE |
16015 Racetrack Road, Odessa, FL 33566 |
30 |
06076-111 |
06076-111 |
P |
100 |
0 |
Project Close Out in Progress |
|
5/06 Kick-off meeting. 6/06 Data
gathering. 8/06 Capacity report.
Analysis of pumping capacity expected
7/24/2006. 9/06 Receive analysis of
pumping capacity. 10/06 Design
continues. Review with Cosme to develop draft design scope. 12/06 Final Buildi |
ing Study scope development for density. |
|
|
|
|
|
|
420 |
A |
D |
March |
| 06100-111 |
City |
D |
0 |
US 19 WHITNEY ROAD TO SR 60 OVERPASS - 36" WTM RELOCATION |
US 19 Whitney Road to SR 60 overpass |
18 |
06100-111 |
06100-111 |
P |
0 |
0 |
Negotiate Easement with FDOT,
Meeting with City/FDOT Senior Staff |
|
JPA documents sent to FDOT 8/06.
Don Pablos FDOT agreement to provide easement and Temporary
Construction Easement (TCE) to City. |
|
|
|
|
|
|
|
200 |
M |
D |
March |
| 06100-211 |
Greeley and Hansen Engineers |
D |
87801 |
US 19 WHITNEY ROAD TO SR 60 OVERPASS-36" WTM RELOCATION AT ALLENS
CREEK |
US 19 Whitney Road to SR 60 at Allens' Creek |
18 |
06100-211 |
06100-211 |
P |
92 |
0 |
04/08 - Submit Permit Applications
05/08 - Prepare 100% Design |
|
|
|
|
|
|
|
|
|
420 |
A |
D |
March |
| 06100-311 |
Greeley and Hansen Engineers |
D |
98684 |
US 19 WHITNEY ROAD TO SR 60 OVERPASS - 48" WTM RELOCATION - US 19
SOUTH |
US 19 Whitney Road to SR 60 Overpass - US 19 S |
18 |
06100-311 |
06100-311 |
P |
50 |
0 |
04/08 - Negoitate Agreement with FDOT
05/08 - 90% Design 05/08 -
Submit 90% Design to FDOT |
|
|
|
|
|
|
|
|
|
420 |
A |
D |
March |
| 06100-411 |
Greeley and Hansen Engineers |
D |
82389 |
US 19 WHITNEY ROAD TO SR 60 OVERPASS - 48" WTM RELOCATION - US 19
PHASE 2 NORTH |
US 19 Whitney Road to SR 60 Overpass - US19 PH2N |
18 |
06100-411 |
06100-411 |
P |
60 |
0 |
04/08 - Negoitate Agreement with FDOT
05/08 - 90% Design 06/08 -
Submit 90% Design to FDOT |
|
|
|
|
|
|
|
|
|
420 |
A |
D |
March |
| 06102-111 |
Advanced Engineering & Design, Inc. |
D |
37231 |
46 A/N FROM 62 S/N TO 80 S/N - ROAD WIDENING PROJECT- WATERMAIN
RELOCATIONS |
46 A/N from 62 S/N to 80 S/N |
18 |
06102-111 |
06102-111 |
P |
97 |
0 |
03/08 - Submit DEP Permit 03/08 -
Submit Final Design to County 04/08 -
Receive County Review Comments |
|
10/06 Submit JPA and Advanced proposal to City Council. |
|
|
|
|
|
|
|
420 |
A |
D |
March |
| 06109-111 |
Advanced Engineering & Design, Inc. |
D |
15501 |
BRIDGE - JOE'S CREEK & 62 S/N DRAINAGE IMPROVEMENTS - 8" WM
REPLACEMENT |
Joe's Creek & 62 S/N |
18 |
06109-111 |
06109-111 |
P |
97 |
0 |
03/08 - Finalize Current Activities
04/08 - Initiate Project Close Out |
|
9/06 NTP to Advanced Engineering. Project scope increased from 42 A/N to
46 A/N. Revised JPA sent to Pinellas County. Advanced Engineering to
provide an Engineers Estimate by 10/06. 11/06 Plans and engineer's estimate. |
|
|
|
|
|
|
|
420 |
A |
D |
March |
| 07046-121 |
City |
D |
0 |
WATER TRANSMISSION MAIN 36" & 48" SURVEY AND AS-BUILT
UPDATE |
66 Street North |
18 |
07046-121 |
07046-121 |
P |
15 |
0 |
04/08 - Submit 36" Survey to WRD
04/08 - Continue Work on 48" Main
05/08 - Submit 48" Survey to WRD |
|
|
|
|
|
|
|
|
|
200 |
M |
D |
March |
| 07082-110 |
City |
D |
0 |
CLAM BAYOU LITTER PREVENTION EDUCATION CAMPAIGN |
Clam Bayou |
18 |
07082-110 |
07082-110 |
P |
25 |
0 |
04/08 - Install Signs |
|
|
|
|
|
|
|
|
|
200 |
M |
D |
March |
| 08034-111 |
Advanced Engineering & Design, Inc. |
D |
6821 |
PINELLAS BAYWAY BRIDGE FDOT 256903-1-52-02 |
Pinellas Bayway |
18 |
08034-111 |
08034-111 |
P |
5 |
0 |
04/08 - FDOT Review 04/08 - Revise
Plans per FDOT Comments |
|
|
|
|
|
|
|
|
|
420 |
A |
D |
March |
| 08038-111 |
Carollo Engineers, P.C. |
D |
87670 |
COSME WTP - FACILITIES AND OPERATIONS EVALUATION |
16015 Racetrack Road, Odessa, FL 33566 |
29 |
08038-111 |
08038-111 |
P |
100 |
0 |
04/08 - Finalize Project 05/08 -
Initiate Project Close Out |
|
|
|
|
|
|
|
|
|
420 |
A |
D |
March |
| 08042-119 |
Mactec Engineering & Consulting, Inc. |
D |
4865 |
EXECUTIVE DRIVE IMPROVEMENTS |
Executive Drive from 34 S/N to Heron Blvd |
07 |
08042-119 |
08042-119 |
P |
95 |
0 |
05/08 - Finalize Right-of-Way by Economic Development 06/08 - Begin Construction |
|
|
|
|
|
|
|
|
|
420 |
A |
D |
March |
| 08046-111 |
Wetlands by Design |
C |
3300 |
COSME VEGETATION CONTROL IN POND AND DITCH |
16015 Racetrack Road, Odessa, FL 33566 |
39 |
08046-111 |
08046-111 |
P |
100 |
0 |
04/08 - Finalize Project 05/08 -
Initiate Project Close Out |
|
|
|
|
|
|
|
|
|
200 |
M |
D |
March |
| 03089-111 |
Wharton-Smith Inc. |
C |
4520000 |
NW WRF - DIFFUSED AERATION CONVERSION |
7500 - 26 A/N |
07 |
03089-111 |
03089-111 |
P |
70 |
1 |
4/08 - Continue Construction. 5/08 - Continue Construction. 6/08 -
Continue Construction |
|
January 2004 - North aeration tank drained and cleaned. January 23, 2004 - Technical memorandum on new blower building submitted by MPI. February 3, 2004 - Review meeting to
discuss blower building. March 3, 2004
- Mactec submitted report on inspectio |
November 4, 2004 - City Council award for final design Task Order. May 16, 2005 - 75% design review. July 19, 2005 - Refeived 90% plans and
specifications. July 25, 2005 - Plans and specifications forwarded for
review. July 28, 2005 - Engineer estimate |
forwarded. 3/06 Preadvertisement
meeting, building permit. 4/06 FDEP
permit and Building Permit applications. 9/06 Final plans & specs. 10/06 Advertise. 12/06 Open bids. |
|
|
|
Jim Mallen |
Wharton-Smith, Inc. |
200 |
A |
C |
March |
| 03103-111 |
Advanced Engineering & Design, Inc. |
D |
144160.4 |
PINELLAS BAYWAY FORCE MAIN REPLACEMENT-PHASE 2 (DESIGN & BIDDING) |
Pinellas Bayway |
07 |
03103-111 |
03103-111 |
P |
100 |
1 |
04/15/08 - Open Bids 04/08 -
Evaluate Bids 05/08 - Award
Contract 06/08 - Begin Construction |
|
September 24, 2003 - Issued Notice to Proceed to Advanced
Engineering. December 11, 2003 - Meeting with FDOT on site. May 7, 2004 - 75% review meeting with Water
Resources Department. August 4, 2004 -
90% review meeting with WRD. January
19, 2005 - |
Review meeting to revise design.
March 2005 - Reviewed scope and fee, negotiation and work order amendment pending.
Due to the change of scope of work this project will re-start as work
order amendment. April 22, 2005 -
Project status meeting. |
Workorder Amendment forwarded for approval. June 16, 2005 - City Council
contract award. June 29, 2005 - NTP. August 2005 -
Survey soft bore. 3/06
Preadvertisement meeting. 4/06
Awaiting clearance from Progress Energy for final design. 5/06 95% Design. |
10/06 Obtain FDOT Permit. |
|
|
|
|
420 |
A |
D |
March |
| 03307-017 |
Ervin Bishop Construction |
C |
81124.75 |
REBUILD NORTHWEST COMMUNITY CENTER |
5801 - 22 A/N |
42 |
03307-017 |
03307-017 |
P |
|
1 |
Closeout project and issue final payment. |
|
03/31/08- Final payment pending repair of roof leaks. |
|
|
|
|
|
|
|
200 |
A |
|
March |
| 04025-002 |
City |
X |
0 |
PASADENA AVE (SR 693) FDOT FPID 257076 |
Pasadena Avenue and 66th Street |
18 |
04025-002 |
04025-002 |
P |
100 |
1 |
04/08 - City to Add Thermo Plastic Striping 05/08 - Submit Final Reimbursement to FDOT |
|
May 4, 2004 - Permit application to FDOT.
June 21, 2004 - FDOT utility permit for water main relocation received, permit expires October 17, 2004. June 17, 2004 - FDOT permit approved,
#04-H-799-0047. September 2004 - FDOT
permit extension obtained. |
February 7, 2005 - Project commenced.
March 2005 - Mast arm conflicts completed. June 2005 - MOT plan to FDOT for 27" sanitary sewer
relocation. August 2005 - All Water Resources relocations completed. 2/06 Commence 27" sanitary sewer
replacement. |
3/06Resurface Pasadena Avenue.
4/06 Obtain reimbursement funds from FDOT. WR obtaining revised
prices from Purcell and All american.
4/06 Commence construction on 27" sanitary sewer. FDOT evaluating alternatives: 1. Proving
additional LAP money. |
2. FDOT doing the work under Fast Response Contracts. Prepare bid documents for Superpavement of Pasadena. FDOT offer to increase LAP funding from
$56,000 to $180,000 with "Marshall" asphalt to City specs. Send
specs to FDOT for approval. Obtain revised |
quote from Purcell for day time work.
Project to be re-bid in 2007 Annual Resurfacing Contract. |
|
|
|
200 |
M |
D |
March |
| 04063-111 |
Westra Construction Corporation |
C |
4052000 |
NW WRF - HEADWORKS IMPROVEMENTS |
7500 - 26 A/N |
07 |
04063-111 |
04063-111 |
P |
99 |
1 |
4/08 Project close out. |
|
February 24, 2004 - Limited Notice to Proceed (NTP) issued to Parsons
Engineering Science (PES). March 16, 2004 -
Kick-off meeting. April 1, 2004 - City
Council approved Task Order with PES. May 5, 2004 - Receive draft technical
memorandum. May 13, 2004 |
Issue full Task Order NTP. May 27,
2004 - Review meeting of Technical memorandum. September 17,
2004 - Work order for structural investigation complete. December 10, 2004 - NTP for Grit Removal
preliminary design. April 1, 2005 -
Workorder Amendment |
2 approved. May 19, 2005 - City
Council award for final design. June
1, 2005 - Issue Notice to Proceed for final design
to Parsons Water and Infrastructure.
June 20, 2005 - Kick-off meeting for final design. June 21, 2005 - Issue Notice to Parsons |
Water and Infrastructure for
Survey and Geotechnical. July 15, 2005 - Received 60% design. July 15, 2005 - 60% design submitted for review. 3/06 Advertise for bids. 4/06 Bidding process Open bids. 5/06 Bid evaluation, workorder amendment,City
Council |
Agenda. 7/06 Contract agreement
execution. 8/06 NTP for construction,
shop drawings. 9/06 Construction commencement.
10/06 Contractor mobilize. 12/06
Excavate and relocate piping and electrical system. |
|
Mark Laney |
Westra Construction Corporation |
200 |
A |
C |
March |
| 05032-111 |
Advanced Engineering & Design, Inc. |
D |
14000 |
PARK STREET/STARKEY ROAD - TYRONE BLVD TO 84 LANE N PID#864 |
Park Street/Starkey Road from Tyrone Blvd to 84 |
18 |
05032-111 |
05032-111 |
P |
100 |
1 |
04/08 - Consultant to Submit Revised 30% Plans 04/08 - Submit Revised 30% Plans to
County 05/08
- Inititate Project Close Out 06/08 -
Close Out Project |
|
May 12, 2005 - Utility coordination meeting. May 2005 - SUE information completed and included in Pre-final plans.
May 2005 - Received pre-final plans from URS phase 2. May 2005 - Phase
2 Tyrone Blvd to 54 delayed until 2008.
1/06 Field review. |
2/06 Revise scope after Water Resources meeting. 3/06 Commence 30% design utility
review. Agree
preliminary layout with WRD. Put ON
HOLD until 46 Avenue design is complete. 10/06 Preliminary design by Advanced
Engineering continues. NTP issued to |
Advanced Engineering 10/24/06 for 30% plans and a revised engineers
estimate. |
|
|
|
|
|
420 |
A |
D |
March |
| 05103-112 |
Owen Ayers & Assoc. Inc. |
X |
28518.65 |
SIDEWALK - PEDESTRIAN BRIDGE - PARK S/N BETWN 5 A/N & COUNTRY CLUB
WAY |
Park Street between 5 A/N and Country Club Way |
04 |
05103-112 |
05103-112 |
P |
100 |
1 |
Completed As-Built drawings and distributed. Project close out. |
|
August 2005 - Survey completed. Plans are at the 50% complete stage.
Wooden beams for this structure shall be ordered
as soon as possible (ASAP). 50% plans submittal was forwarded to Pinellas
County for review and comments. Discussion with SWFWMD for |
permit underway. They request elevation for bridge be at the one-hundreds
year flood level. Submit Right-of-Way permit
application to County. Received comment. Met with County. Revised plans and
submitted 4 sets for review for pedestrian bridge (timber) |
and concrete sidewalks. 3/06
Bridge construction and South approach is completed. Awaiting one guy wire to be relocated by cable company and then
will construct North approach and begin sidewalk construction. |
2/06 Received County R/W permit.
Construction on bridge started. Power & Phone Co. are relocating the guide wires for approved sidewalk. 3/06 Bridge construction and South approach
is completed. Awaiting one guy wire to be relocated by cable company |
and then will construct North approach and begin sidewalk
construction. City completed timber pedestrian sidewalk bridge and concrete sidewalk
approaches to just before intersection s of 5 Avenue /Park Street and 9
Avenue/Park Street. County completing |
sidewalks at the above intersections, including ramps. 6/06 County completed concrete sidewalk at Country Club intersection and modified intersection
at Park street. After relocating Admiral Farragut signat 5 Avenue and Park
Street intersection, County |
|
|
420 |
A |
D |
March |
| 06066-111 |
Boyle Engineering Corporation |
D |
230528 |
LIFT STATION 61 - PASADENA MASTER REHABILITATION |
6800 Travelers Way South |
07 |
06066-111 |
06066-111 |
P |
60 |
1 |
04/08 - Prepare 90% Design 05/08 -
Prepare 90% Design 06/08 - Review 100%
Design |
|
4/06 Data gathering. 10/06 Final report. Submit final report to the
contributing entities. |
|
|
|
|
|
|
|
420 |
A |
D |
March |
| 06083-112 |
Sprinkle Consulting, Inc. |
D |
12320 |
TRAFFIC CIRCLE - PARK S/S & VILLA GRANDE A/S |
Park S/S & Villa Grande A/S |
33 |
06083-112 |
06083-112 |
P |
95 |
1 |
04/08 - Finalize Evaluation with Neighborhood Associaton 05/08 - Revise Design As-needed 06/08 - Finalize
Bid Documents |
|
4/23/06 Workorder completed.
6/19/06 Kick-off meeting. Survey in progress. 8/06 Survey completed. 10/06 Review Draft
Preliminary Design. |
|
|
|
|
|
|
|
420 |
A |
D |
March |
| 06101-110 |
Marine Contracting Group, Inc. |
C |
83800 |
ARTERIAL CHANNEL "A" DREDGING |
1700 Park Street North |
30 |
06101-110 |
06101-110 |
P |
1 |
1 |
Continue Dredging |
|
7/06 Work order approved awaiting schedule from Survey. 10/06 Finalize Permits. |
|
|
|
|
|
Tony Corson |
Marine Contracting Group, Inc. |
200 |
A |
C |
March |
| 07036-112 |
City |
D |
0 |
SIDEWALK - PARK S/N AT ELBOW LANE N |
Park Street at Elbow Lane North |
23 |
07036-112 |
07036-112 |
P |
0 |
1 |
05/08 - Begin Construction by City Forces |
|
|
|
|
|
|
|
|
|
200 |
M |
D |
March |
| 07038-110 |
PBS & J Incorporated |
D |
74396 |
JUNGLE LAKE OUTFALL STORM DRAINAGE IMPROVEMENTS |
Between Jungle Lake and Boca Ciega Bay |
01 |
07038-110 |
07038-110 |
P |
15 |
1 |
04/08 - Begin Detail Design 04/08
- Council Award of Task Order 05/08 -
Continue Design |
|
|
|
|
|
|
|
|
|
420 |
A |
D |
March |
| 07071-111 |
APAC Southeast, Inc. |
C |
127605.85 |
PASADENA AVENUE (SR 686) FDOT-FPID 257076 |
PASADENA AVENUE (SR 686) |
18 |
07071-111 |
07071-111 |
P |
100 |
1 |
04/08 - City to add Thermoplastic Striping 05/08 - Invoice FDOT |
|
|
|
|
|
|
|
|
|
200 |
A |
D |
March |
| 07076-111 |
City |
D |
0 |
BEAR CREEK BRIDGE WM @ MANGO A/S - BRIDGE & DRAINAGE IMPROVEMENTS |
Bear Creek Bridge at Mango A/S |
18 |
07076-111 |
07076-111 |
P |
5 |
1 |
04/08 - Review County Shop Drawings |
|
|
|
|
|
|
|
|
|
200 |
M |
D |
March |
| 08045-110 |
George F. Young, Inc. |
D |
24805 |
ADMIRAL FARRAGUT DREDGING |
501 Park Street North |
30 |
08045-110 |
08045-110 |
P |
0.6 |
1 |
03/08 thru 06/08 - Permit Reviews |
|
|
|
|
|
|
|
|
|
420 |
A |
D |
March |
| 08050-120 |
City |
D |
0 |
BEAR CREEK STORMWATER INJECTION WELL SYSTEM PLUGGING AND ABANDOMENT |
Bear Creek |
45 |
08050-120 |
08050-120 |
P |
5 |
1 |
04/08 - Prepare Design 04/08 -
Submit FDEP Permit 05/08 - FDEP
Review 06/08 - Finalize Bid Documents |
|
|
|
|
|
|
|
|
|
200 |
M |
D |
March |
| 08212-117 |
City |
D |
0 |
SWIMMING POOL IMPROVEMENTS FY08 - WALTER FULLER |
7883 - 26 A/N |
43 |
08212-117 |
08212-117 |
P |
|
1 |
Complete work by mid April, test balance, put pool back in operation. |
|
3/31/08 Contract issued and Progressive Pools to finish by late April.
Expect to have the pool back into operation by
late April at. the earliest. |
|
|
|
|
|
|
|
200 |
M |
|
March |
| 08229-017 |
City |
D |
0 |
WALTER FULLER MASTER PLAN IMPROVEMENTS |
7891 - 26 A/N |
42 |
08229-017 |
08229-017 |
P |
|
1 |
Complete DD drawings. Develop
priority listing and estimate of probable cost. Schedule public input meeting. |
|
03/31/08 Design started in March 2008. First portion of survey to be
completed April 2008. |
|
|
|
|
|
|
|
200 |
M |
|
March |
| 00032-311 |
City |
D |
0 |
RECLAIMED WATER SYSTEM - PCCP REPLACEMENT - PHASE II |
1 S/N from 72 A/N TO 78 A/N & 1 S/N along 77 A/N |
07 |
00032-311 |
00032-311 |
P |
35 |
2 |
Project on Hold |
|
|
|
|
|
|
|
|
|
200 |
M |
D |
March |
| 00064-119 |
Tampa Bay Engineering, Inc. |
D |
374755.73 |
GANDY BLVD WIDENING FROM 28 S/N TO DR MARTIN LUTHER KING JR S/N (9 S/N) |
Gandy Blvd from 28 S/N to Dr Martin Luther King |
07 |
00064-119 |
00064-119 |
P |
95 |
2 |
04/08 - Finalize Land Swap & Construction Agreement 04/08 - NTP for PDE Study 04/17/08 - Council
Approve LAP 05/08 - Add Federal
Requirements to Specifications 06/08 -
Council apporve Land Swap & Construction Agreement |
|
January 16, 2003 - Received SWFWMD permit. January 17, 2003 - Received FDOT
permit. 12/05 Follow-up meeting with FDOT regarding upcoming project. 1/06 City/FDOT decision regarding
construction phase of this project.
2/27/06 Meeting with FDOT regard- |
ing land swap for Gandy/16th Street. 9/06 Negotiate with FDOT regarding land swap. 10/06 City Council
approval of the land swap with FDOT. |
|
|
|
|
|
|
310 |
A |
D |
March |
| 01062-119 |
Tampa Bay Engineering, Inc. |
D |
66918 |
GANDY / 16 S/N SERVICE ROAD REALIGNMENT |
Gandy Blvd / 16 S/N Service Road |
07 |
01062-119 |
01062-119 |
P |
95 |
2 |
04/08 - Finalize Land Swap & Construction Agreement 04/08 - NTP for PDE Study 04/17/08 - Council
Approve LAP 05/08 - Add Federal
Requirements to Specifications 06/08 -
Council apporve Land Swap & Construction Agreement |
|
Received 100% plans & specifications. |
|
|
|
|
|
|
|
310 |
A |
D |
March |
| 02073-110 |
City |
D |
0 |
70 A/N AND VICINITY SDI - SMMP N-1-1 |
70 A/N and Vicinity |
01 |
02073-110 |
02073-110 |
P |
30 |
2 |
Hydraulic Evaluation of Channel |
|
September 2003 thru November 2004 - No progress due to other
priorities.ŤŠOctober 2004 - Change in design
status. September 2003 thru November 2004 - No progress due to other
priorities. October 2004 - Change in design status. September
2005-Indications |
are the proposed project N-1-1 alone cannot succeed in solving the
flooding deficiencies. Additional project(s) will
be checked to determine scope. Limited budget will likely result in project
cancellation. 11/05 No further analysis will be made until |
mangrove trimming in April 2006.
5/06 Review site and model after mangrove trimming. 5/06 Awaiting
confirmation of Mangrove trimming. |
solving the flooding deficiencies. Additional project(s) will be checked
to determine scope. Limited budget will likely
result in project cancellation. 11/05 No further analysis will be made until
mangrove trimming in April 2006. 5/06
Review site and |
model after mangrove trimming.
5/06 Awaiting confirmation of Mangrove trimming. Drainage operations requests a letter to Pinellas County seeking
permission to trim mangroves. 8/06
Prepare and submit letter in behalf of (Drainage operations requests a l |
letter to Pinellas County seeking permission to trim mangroves.) 10/06 Submit County Permit to remove mangroves. |
|
|
200 |
M |
D |
March |
| 03102-119 |
Kimmins Contracting Corp. |
C |
1130462.84 |
28 S/N & 118 A/N INTERSECTION RECONSTRUCTION |
28 S/N & 118 A/N |
07 |
03102-119 |
03102-119 |
P |
99 |
2 |
3/08 OTED Site Visit. 4/08
Receive OTED Reimbursement. |
|
January 8, 2004 - Meeting with Pinellas County and SWFWMD. March 1, 2005 - NTP for sidewalk design. March
24, 2004 - Right-of-way permit application to Pinellas County Public Works
Department. May 28, 2005 - OTTED
report submitted for reimbursement. |
June 24, 2005 - Received 100% plans.
4/06 Bid opening and bid evaluation.
5/06 Low qualified bidder was Kimmins
Contracting in the amount of $1,170,455.
6/06 City Council award preparation.
6/15/06 City Council award.
8/06 Shop drawings submitted. |
9/06 Shop drawing review process. 10/06 Start construction. |
|
|
|
Tim Hume |
Kimmins Contracting Corporation |
200 |
A |
C |
March |
| 04037-111 |
Spectrum Underground, Inc. |
C |
1488869.1 |
LIFT STATION #42 - NEW 24-INCH FORCE MAIN - JIM WALTERS |
10201 - 9 S/N |
07 |
04037-111 |
04037-111 |
P |
97 |
2 |
04/08 - Contractor to Complete Construction 05/08 - Punch List 06/08 - Close out construction Contract |
|
May 26, 2004 - Preapplication meeting with FDOT. October 15, 2004 - FDOT permit
received. October
28, 2004 - FDEP permit received.
January 31,, 2005 - Preadvertisement meeting. March 30, 2005 - Pre-bid meeting held. April 19, 2005 - Bids opened. |
July 7, 2005 - City Council award. July 2005 - Preconstruction meeting,
Issue Notice to Proceed. September 20, 2005 -
Preconstruction conference. 11/05 Shop drawing review and approval. 3/06 Fourth S/N directional bore completed;
Gandy Blvd lane crossin |
underway. Open cut construction continues. 7/06 Locate and retrieve Gandy Blvd
bore. 10/06 Retrieve lost bore. |
|
|
|
Chuck Perry |
Spectrum Underground, Inc. |
200 |
A |
C |
March |
| 05088-111 |
TBE GROUP, INC. |
X |
97699 |
LS 69 ANALYSIS |
9399 - 28 Street North |
07 |
05088-111 |
05088-111 |
P |
1 |
2 |
6/07 Project Close Out in Progress |
|
May 23, 2005 - Workorder approved. June 7, 2005 - Notice to Proceed
issued to TBE for $30,855.00. June 15, 2005 -
Meeting with Pinellas County Public Works Department to discuss the scope of
work. June 24, 2005 - Memo review
meeting. June 2005 - |
Received project Memorandum. September 16, 2005 - Work order amendment
approved final design plans and Technical Memo for
ultimate flow projections. 4/06 Final
report. 10/06 Finalize Report. 12/06
Final report review meeting. |
|
|
|
|
|
|
420 |
A |
D |
March |
| 05387-019 |
City |
D |
0 |
NORTH BRANCH ROOF WATERPROOFING |
861 - 70 A/N |
44 |
05387-019 |
05387-019 |
P |
|
2 |
|
|
03/31/08 Project still on hold |
|
|
|
|
|
|
|
200 |
M |
|
March |
| 06120-119 |
TBE GROUP, INC. |
D |
210705 |
GATEWAY AREA WIDE DRI BUILD-OUT EXTENSION TRAFFIC STUDY |
Gateway area |
07 |
06120-119 |
06120-119 |
P |
90 |
2 |
04/08 - Prepare 95% Submittal
05/08 - Review 95% Submittal
06/08 - Finalize DRI |
|
|
|
|
|
|
|
|
|
420 |
A |
D |
March |
| 07004-710 |
City |
D |
0 |
SIDEWALK - 4 S/N FROM 110 TO 112 A/N |
4 S/N FROM 110 TO 112 A/N |
23 |
07004-710 |
07004-710 |
P |
90 |
2 |
Construction by City Forces
Add handrail per FDOT |
|
|
|
|
|
|
|
|
|
200 |
M |
D |
March |
| 07043-112 |
City |
D |
0 |
TRAFFIC SEPARATOR 94 A/N WEST OF 4 S/N |
94 A/N WEST OF 4 S/N |
37 |
07043-112 |
07043-112 |
P |
95 |
2 |
Project Close Out in Progress |
|
|
|
|
|
|
|
|
|
200 |
M |
D |
March |
| 07080-110 |
City |
D |
0 |
112 A/NE MANGROVE MITIGATION |
112th Avenue Northeast |
18 |
07080-110 |
07080-110 |
P |
|
2 |
04/08 - Process Work Order |
|
|
|
|
|
|
|
|
|
200 |
M |
D |
March |
| 08031-112 |
City |
D |
0 |
ACCELERATION LANE - DR MARTIN LUTHER KING JR STREET/94 A/N |
Dr Martin Luther King Jr Street / 94 A/N |
37 |
08031-112 |
08031-112 |
P |
95 |
2 |
04/08 - Finalize Design and Construction Cost 05/08 - To SWTOD for Construction 06/08 - Initiate
Construction |
|
|
|
|
|
|
|
|
|
200 |
M |
D |
March |
| 08219-017 |
Wannemacher Russell Architects, Inc. |
D |
83936 |
WILLIS JOHNS CENTER IMPROVEMENTS |
6635 Dr MLK Jr S/N |
42 |
08219-017 |
08219-017 |
P |
|
2 |
Develop construction estimates.
Proceed with construction documents provided estimate is within budget. |
|
3/31/08 Reviewed schematic design with recreation staff. Continue schematic design |
|
|
|
|
|
|
|
410 |
A |
|
March |
| 04042-111 |
Wharton-Smith Inc. |
C |
2547000 |
NE WRF GRAVITY BELT THICKENER REPLACEMENT |
1160 - 62 A/NE |
07 |
04042-111 |
04042-111 |
P |
30 |
3 |
04/08 - Continue Construction
05/08 - Continue Construction
06/08 - Continue Construction |
|
December 4, 2003 - NTP issued to consultant for Basis of Design Report
(BODR). January 8, 2004 - BODR kick-off meeting. March 3, 2004 - Receive draft BODR. March 23, 2004 - Draft BODR design
review. April 13, 2004 - Tampa Bay
Engineering (TBE) submit |
ted revised site layout. April 29,
2004 - Site layout review meeting. May
19, 2004 - Receive final BODR. June 7, 2004 - Work order amendment
circulated for signatures. July 16,
2004 - Limited NTP for detail design.
August 3, 2004 - Design kick-off |
meeting. February 22, 2005 - 90%
plans & Specifications. March 17,
2005 - 90% design review meeting held. April 14, 2005 - 100% plans. May 23, 2005 - Received 100% plans and
specifications. May 23, 2005 - 100%
plans and specifications distributed |
for review. June 6, 2005 - 100%
review meeting. August 3, 2005 - 100%
review meeting. August 30, 2005 - Application for
building permit. 2/01/06 Prebid
meeting. 2/16/06 Bid opening. 4/06 Bids to high. Combine with NW Diffused
Aeration and bid in |
June 2006. 10/06 Advertise. 12/06
Open bids. |
|
Jim Mallen |
Wharton-Smith, Inc. |
200 |
A |
C |
March |
| 04061-110 |
United Rentals Highway Technologies, Inc |
D |
0 |
FDOT LAP - SHORE ACRES BICYCLE LANES |
Shore Acres |
33 |
04061-110 |
04061-110 |
P |
100 |
3 |
05/08 - Request Final LAP Reimbursement
06/08 - Initiate Project Close Out |
|
March 18, 2004 - City Council approved FDOT LAP agreement. April 2004 - Execute LAP. June 2004 -
Design started. July 30, 2004 -
Preadvertisement meeting held.
September 16, 2004 - Contract awarded.
September 2004 - Part of project (62nd A/N)ON HOLD |
due to change in scope of work.
December 1, 2004 - Preconstruction meeting for Shore Acres bicycle lanes. 62 A/N between Bayou Grand and First Street
is still ON HOLD> Awaiting work order amendment approval. January 2005 - Survey for phase 2 has been |
completed (62 A/N). January 5,
2005 - Design for 62 A/N commenced.
April 2005 - Additional survey, design
started. Notice to Proceed received
12/14/2005. |
completed (62 A/N). January 5,
2005 - Design for 62 A/N commenced.
April 2005 - Additional survey, design
started. July 2005 - Budget
approved. Notice to Proceed received
12/14/2005. 2/20/2006 - 60% submittal
to FDOT. 5/17/06 95% drawings sent out |
and SWFWMD permit submitted. 6/06 Re-design project. 10/06 62nd A/N -
Design to FDOT. |
|
|
|
200 |
A |
D |
March |
| 05054-112 |
AKCA, Inc. |
C |
324059.94 |
FDOT LAP - BICYCLE ROUTE IMPROVEMENTS FY 05 - FPN#40648425801 |
1 S/N and 1S/S from 30 A/N to 62 A/N and more |
37 |
05054-112 |
05054-112 |
P |
80 |
3 |
3/08 Project close out. |
not been completed |
April 25, 2005 - Completed First street side path feasibility. May 2005 -
Awaiting comments from Transportation Planning
regarding feasibility report. July 2005 - Annual striping contractor bid to
be renewed August 12, 2005. 2/06 Met
with FDOT to dis- |
cuss projectscope. Evaluating scope revisions. 10/06 Awaiting first set
of work orders and plans. 12/06 Continue Design
1/07 Finalize Design |
|
|
|
|
L Hollingworth |
AKCA, Inc. |
200 |
A |
C |
March |
| 05066-110 |
City |
D |
0 |
SHORE ACRES TIDAL BACKFLOW PREVENTION RETROFIT |
Shore Acres |
01 |
05066-110 |
05066-110 |
P |
30 |
3 |
04/08 - Begin Design |
|
April 2005 - Completed initial prioritization matrix. May 2005 - Completed Cost Estimate. 7/06 One tide
flex valve installed, install one per month. 9/06 Stormwater Installing One
Valve per Month. |
|
|
|
|
|
|
|
200 |
M |
D |
March |
| 05090-110 |
George F. Young, Inc. |
D |
47235 |
ARTERIAL CHANNEL "E" DREDGING |
Coquina Key Area |
30 |
05090-110 |
05090-110 |
P |
1 |
3 |
Construction On Hold 04/08 - SWTOD
to install Seagrass Buoys |
4/07 Complete construction. |
10/05 Survey complete. 10/06 Need ACOE Permit. |
|
|
|
|
|
|
|
420 |
A |
D |
March |
| 05104-110 |
Marine Contracting Group, Inc. |
C |
38900 |
SAD CANAL DREDGING - HUNTINGTON S/NE & MASSACHUSETTS A/NE |
Huntington S/NE and Massachusetts A/NE |
26 |
05104-110 |
05104-110 |
P |
1 |
3 |
4/08 Start construction. |
|
September 2005 - Issued NTP.
3/21/06 Received preliminary plans for dredging. 10/06 Resolve Easement. |
|
|
|
|
|
Tony Corson |
Marine Contracting Group, Inc. |
200 |
A |
C |
March |
| 06047-110 |
Marine Contracting Group, Inc. |
C |
573100 |
ARTERIAL CHANNEL P DREDGING |
Riviera Bay and Bayou Grande |
30 |
06047-110 |
06047-110 |
P |
1 |
3 |
Continue Dredging |
3/07 Complete construction. |
4/06 Permit application; FDEP, ACOE and PCWNA. 10/06 Finalize Permits. |
|
|
|
|
|
Tony Corson |
Marine Contracting Group, Inc. |
200 |
A |
C |
March |
| 06053-111 |
PBS & J Incorporated |
D |
56545 |
NE WRF ODOR CONTROL |
1160 - 62nd Avenue Northeast |
07 |
06053-111 |
06053-111 |
P |
97 |
3 |
04/08 - Submit for Building Permit
04/08 - Prepare 100% Design
05/08 - Review 100% Design |
|
12/9/05 NTP to TBE Group, Inc. for $ 30,012. Allowance of $5,812 remaining. 1/06 Data acquisition. 4/06 Draft preliminary
engineering report. 7/06 Bioway and Vapex presentation. 10/06 Task
Order for final design/workorder approval. |
|
|
|
|
|
|
|
420 |
A |
D |
March |
| 06056-110 |
TBE GROUP, INC. |
D |
99993 |
GRAND CANAL BLVD NE BRIDGE REPLACEMENT OVER GRANDE CANAL |
Grand Canal & Kansas Avenue |
04 |
06056-110 |
06056-110 |
P |
100 |
3 |
08/08 - Prepare Bid Documents
09/08 - Advertise 10/08 - Open
Bids |
|
Survey will be completed by end of January 2006. Consultant to start
design and geotechnical for substructure. 2/06 NTP was issued for consultant. Survey
completed. Geotechnical underway. 3/06 Consultant submitted proposed typical
section for the bridge |
Approved typical was forwarded to
TBE. Preliminary design underway.
Received 30% plans for review. Forwarded
plans to utilities for review and comment, will submit review comments to TBE
first week of May. Review comments of
30% plans forwarded to |
consultant to be incorporated into 75% plans. 6/06 Continue final plans/specs. Submit
permits to agencies. A Public Information meeting was held on
7/13/2006. Approximately thirty (30) residents attended the meeting. Plans
were described and shown to |
to the residents. Questions were answered. Residents to submit window
shape selection for concrete bridge railing to the
City. 10/06 Review 95% Documents. Submit County Permit. |
|
|
|
|
420 |
A |
D |
March |
| 06117-111 |
City |
D |
0 |
NE WRF PLATTING |
1160 - 62 Avenue Northeast |
07 |
06117-111 |
06117-111 |
P |
25 |
3 |
04/08 - Development Services Reviewing Platt 05/08 - Council Approve Platt |
|
|
|
|
|
|
|
|
|
200 |
M |
D |
March |
| 07039-121 |
Land & Water Engineering Science, Inc. |
D |
23740 |
NE WRF - LAND RECLAMATION |
1160 - 62 Avenue Northeast |
07 |
07039-121 |
07039-121 |
P |
80 |
3 |
8/07 Respond to FDEP comments.
9/07 FDEP review process. 10/07
FDEP and COE permits. |
|
12/06 Permit for Pond De-watering & Vegetation Control burning. |
|
|
|
|
|
|
|
420 |
A |
D |
March |
| 07083-121 |
City |
D |
0 |
STORMWATER POND MAINTENANCE & MONITORING AT NE WRF SITE-FDEP
52-0168628-004 |
1160 - 62 Avenue Northeast |
39 |
07083-121 |
07083-121 |
P |
5 |
3 |
05/08 - Field Inspection Ongoing -
Monitor and Report on Pond as Required |
|
|
|
|
|
|
|
|
|
200 |
M |
D |
March |
| 00186-019 |
City |
D |
0 |
4TH STREET BUSINESS DISTRICT |
Multiple Sites |
41 |
00186-019 |
00186-019 |
P |
|
4 |
Hardscape construction anticipated to begin in July with completion
anticipated for Spring 2008; landscape work to
proceed upon completion of work by General Contractor. Landscape estimates to be provided to
Engineering in early March; permit drawing pr |
|
3/31/08 Preparation of landscape cost estimate and implementation
schedule in progress. |
|
|
|
|
|
|
|
200 |
M |
|
March |
| 02049-110 |
APAC Southeast, Inc. |
C |
2364118.91 |
FDOT-LAP-DOWNTOWN RESURFACING SR 595 (4 A) FROM 5 A/N TO 3 S/N |
SR 595 (4th St) from 5th Ave N To 3rd St N |
07 |
02049-110 |
02049-110 |
P |
95 |
4 |
4/08 Install Thermo striping. Prepare Punch List |
|
January 20, 2004 - Received and distributed 95% design to FDOT and
City. April 2004 - FDOT review process.
February 4, 2005 - Advertise for bids.
February 25, 2005 - Addendum No. 1.
March 9, 2005 - Bid opening.
April 28, 2005 - City Council award |
date. May 2005 - Contract award
process. 5/20/05 - Utility schedule
forwarded to Ms. Jenkins at FDOT. 10/31/05 FDOT
check list and revised specification to FDOT for approval. 11/05 City forwards LAP check list to FDOT.
1/12/06 Supplement agreement |
No.4 forwarded to FDOT for approval.
4/06 FDOT approval for bidding.
5/06 Federal Highway Administration (FHWA)
approval. 5/06 NTP from FDOT for
construction phase. 6/06 Advertise for
bids. 7/19/06 Prebid meeting. 10/06 Council Approve LAP. |
|
|
|
Bruce Stenfors |
APAC Southeast, Inc. |
200 |
A |
C |
March |
| 02050-110 |
APAC Southeast, Inc. |
C |
3797445.7 |
FDOT-LAP-DOWNTOWN RESURFACING SR 687 (3 ST) FROM 5 A/S TO 5 A/N |
SR 687 (3rd St) from 5th Ave S To 5th
Ave N |
07 |
02050-110 |
02050-110 |
P |
90 |
4 |
4/08 Complete construction -
Except added activities to contract.
5/08 Install decorative crosswalks. 6/08
Install Swinging Mast Arms. |
|
January 20, 2004 - Received and distributed 95% design to FDOT and
City. April 2004 - FDOT review process.
February 4, 2005 - Advertise for bids. April 28, 2005 - City Council
award date. May 20, 2005 - Utility
schedule forwarded to Ms. Jenkins at |
FDOT. 10/31/05 FDOT check list and revised specification to FDOT for
approval. 1/12/06 Supplement agreement No.4 forwarded to FDOT for approval. 4/06 FDOT approval for bidding. 5/06 Federal Highway Administration (FHWA)
approval. 7/19/06 Prebid meet |
ing. 10/06 Council Approve LAP. |
|
|
|
Bruce Stenfors |
APAC Southeast, Inc. |
200 |
A |
C |
March |
| 02051-110 |
APAC Southeast, Inc. |
C |
3330027.6 |
FDOT-LAP-DOWNTOWN RESURFACING SR 687 (4 ST) FROM 5 A/N TO 5 A/S |
SR 687 (4th Ave) from 5th Ave N To 5th Ave S |
07 |
02051-110 |
02051-110 |
P |
90 |
4 |
4/08 Complete construction -
Except added activities to contract.
5/08 Install decorative crosswalks. 6/08
Install Swinging Mast Arms. |
|
January 20, 2004 - Received and distributed 95% design to FDOT and
City. April 2004 - FDOT review process.
February 4, 2005 - Advertise for bids. April 28, 2005 - City Council
award date. May 20, 2005 - Utility
schedule forwarded to Ms. Jenkins at |
FDOT. 10/31/05 FDOT check list and revised specification to FDOT for
approval. 1/12/06 Supplement agreement No.4 forwarded to FDOT for approval. 4/06 FDOT approval for bidding. 5/06 Federal Highway Administration (FHWA)
approval. 7/19/06 Prebid meet |
ing. 10/06 Council Approve LAP. |
|
|
|
Bruce Stenfors |
APAC Southeast, Inc. |
200 |
A |
C |
March |
| 03087-119 |
Aduddell Industries Restoration |
C |
551500 |
MUNICIPAL SERVICES CENTER GARAGE - REPAIR |
Municipal Services Center garage-one-fourth S/N |
04 |
03087-119 |
03087-119 |
P |
100 |
4 |
12/07 - Award Construction Contract
01/08 - Begin Construction |
|
September 27, 2004 - Notice to Proceed issued. September 2004 - Shop drawings were
submitted and they are being reviewed for
approval. October 2004 - Carbon Fiber
material delivery will delay project.
October 28, 2004 - Work schedule and sequence of |
operations discussed in meeting. Detail schedule provided. November 29,
2004 - Carbon Fiber rods delivered. Thirty (30)
days to install. December 2005 - Carbon fiber reinforcing complete. Sealing
of deck underway. |
February 22, 2005 - Meeting held with contractor. March 2005 - Complete construction - Final
inspection.
March 2005 - Resolve issues; Floors 1-A & B, and 6-A & B. March 17, 2005 - Deck slab leaks
noted. April 19, 2005 - Meeting held
with SSI |
representative to discuss water leaks, PBQD to propose alternative
sealant. May 11, 2005 - Meeting held with PBQD to discuss design options for deck
sealant. May 17, 2005 - Meeting with
Carlisle representative held to discuss sealant topping products. |
June 2005 - Engineering evaluation of alternatives for deck sealant and
finish coat are being tested for adhesion and
appearance. July 2005 - Deck topping samples installed. August 2005 -
Complete evaluation of alternative products. |
|
Tim Hume |
Aduddell Industries Restoration |
200 |
M |
C |
March |
| 05053-112 |
City |
D |
0 |
TRAFFIC SAFETY FY2005 - PEDESTRIAN IMPROVEMENTS - COFFEE POT BLVD/21
A/NE/SNELL |
Coffee Pot Blvd/21 A/NE/Snell |
37 |
05053-112 |
05053-112 |
P |
95 |
4 |
04/08 - Review 100% Design 05/08 -
Submit to SWTOD for Construction 06/08
- Begin Construction |
|
March 23, 2005 - Design 95% complete - Transporation Planning Department
review. May 2005 - Transportation Planning instructs Engineering to place
project ON HOLD pending bike lane installation. 10/06 ON HOLD. |
|
|
|
|
|
|
|
200 |
M |
D |
March |
| 05099-112 |
City |
D |
0 |
INTERSECTION MODIFICATION - 22 A/NE & COFFEE POT BLVD NE |
22 A/NE and Coffee Pot Blvd/NE |
33 |
05099-112 |
05099-112 |
P |
100 |
4 |
04/08 - Prepare 100% Design 05/08
- Prepare Final Bid Documents 05/08 -
Advertise Project |
|
August 2005 - Design is 25% completed. September 2005 - 25% design
completed - Sent for utility check. 11/05 Design
completed. 10/06 Combine with Road Re-construction. |
|
|
|
|
|
|
|
200 |
M |
D |
March |
| 05107-112 |
Ayres Associates Inc. |
D |
26895 |
4 S/N (5 A/N to 30 A/N) BEAUTIFICATION - CITY PORTION |
4 S/N (5 A/N to 30 A/N) |
02 |
05107-112 |
05107-112 |
P |
100 |
4 |
04/08 - FDOT Verifying Right-of-Way
04/17/08 - Pre-ad Meeing 04/08
- FDOT Review 05/08 - Advertise |
|
August thru September 2005 - Title searches for properties. 2/06 Begin property acquisition. LAP expected to
be approved March 2, 2006 by City Council.
2/2/06 LAP approved by City Council and forwarded to FDOT for
execution and Notice to Proceed. |
LAP agreement executed on 3/28/06. Control and specific purpose survey is
underway. Property acquisitions continue. 10/06
Finalize Scope and Fee with Ayres. |
|
|
|
|
|
|
420 |
A |
D |
March |
| 05334-017 |
Angle & Schmid Inc. |
C |
204434.3 |
REBUILD ROBERTS RECREATION CENTER |
1246 - 50 A/N |
42 |
05334-017 |
05334-017 |
P |
|
4 |
Complete building demolition.
Commence final site work in April.
Complete site work in May. |
|
03/31/08- Recreation Dept. operations moved into new building. Demolition
of old buildings pending utility (Verizon and
Progress Energy) clearance to complete site work (60 days after demolition). |
|
|
|
|
|
|
|
200 |
A |
|
March |
| 06042-110 |
City |
D |
0 |
SAD ALLEY PAVING - BTWN 6 & 7 S/N FROM 8 TO 9 A/N |
6 & 7 S/N FROM 8 TO 9 A/N |
26 |
06042-110 |
06042-110 |
P |
100 |
4 |
04/08 - Finalize Project 05/08 -
Initiate Project Close Out |
|
11/05 Survey complete. 1/06 25%
plans sent for utility checks. 10/06 Construction. |
|
|
|
|
|
|
|
200 |
M |
D |
March |
| 06071-112 |
AKCA, Inc. |
C |
4298.36 |
34 A/N - OAKWOOD GARDENS - PAVEMENT MARKING PLAN |
34 A/N between 16 S/N and 21 S/N |
37 |
06071-112 |
06071-112 |
P |
100 |
4 |
Project Close Out in Progress |
|
3/21/06 Received work order.
7/26/06 Forwarded plans for approval from Traffic Planning. 8/21/06 Received
comments from TPD. 8/06 Forward
revised plans to TPD. 10/06 Review Comments back from TPD. |
|
|
|
|
|
|
|
200 |
A |
D |
March |
| 06075-110 |
City |
D |
0 |
SIDEWALK - OAKWOOD GARDENS NEIGHBORHOOD |
Various locations |
23 |
06075-110 |
06075-110 |
P |
100 |
4 |
Project Close Out in Progress |
|
6/06 Transfer to CDBG funding.
7/06 100% Design. 8/06 Bid. 9/06 Bid. |
|
|
|
|
|
|
|
200 |
M |
D |
March |
| 06077-110 |
Aduddell Roofing & Sheet Metal |
C |
299967 |
MIDCORE PARKING GARAGE - MAINTENANCE AND REPAIR |
149 - 2 Street North |
30 |
06077-110 |
06077-110 |
P |
99 |
4 |
4/08 Expansion joints replaced under warranty. |
|
10/06 Issue NTP to Contractor. |
|
|
|
|
|
Tim Hume |
Aduddell Restoration Division |
200 |
A |
C |
March |
| 06085-112 |
Sprinkle Consulting, Inc. |
D |
17550 |
4 S/N HISTORIC BUSINESS DISTRICT - PEDESTRIAN CROSSWALK AT SUNKEN GARDENS |
4 Strett North at Sunken Gardens |
33 |
06085-112 |
06085-112 |
P |
95 |
4 |
Finalize FDOT Review |
|
|
|
|
|
|
|
|
|
420 |
A |
D |
March |
| 06088-112 |
City |
X |
0 |
1 S/N & 38 A/N - INTERSECTION MODIFICATION |
1 Street North & 38 Avenue North |
33 |
06088-112 |
06088-112 |
P |
0 |
4 |
Project Close Out in Progress |
|
Determination of required right-of-way.
8/06 Survey. 10/06 Right of Way
Acquisition. |
|
|
|
|
|
|
|
200 |
M |
D |
March |
| 06089-112 |
Sprinkle Consulting, Inc. |
D |
11862 |
30 A/N & 1 S/N - TRAFFIC CIRCLE DESIGN |
1 S/N & 30 A/N |
33 |
06089-112 |
06089-112 |
P |
100 |
4 |
Project Close Out in Progress |
|
8/06 Draft drawings submitted.
10/06 Review Draft. |
|
|
|
|
|
|
|
420 |
A |
D |
March |
| 06114-119 |
Vinmar Waterproofing & Concrete Restorat |
C |
17875 |
PIER ELECTRICAL REPAIR |
800 Second A/NE |
04 |
06114-119 |
06114-119 |
P |
100 |
4 |
Project Close Out in Progress |
|
10/06 Process Work Order. Prepare Bid Documents. |
|
|
|
|
|
|
|
200 |
A |
D |
March |
| 06121-112 |
Purvis Curbs Corp. |
X |
19759 |
21 A/N WEST OF 2 S/N - RAISED CROSSWALK |
21 A/N west of 2 S/N |
33 |
06121-112 |
06121-112 |
P |
100 |
4 |
|
|
|
|
|
|
|
|
|
|
200 |
A |
D |
March |
| 06379-019 |
Wannemacher Russell Architects, Inc. |
D |
1996.03 |
COLISEUM UPGRADE RESTROOM FIXTURES FY06 |
535 - 4 A/N |
42 |
06379-019 |
06379-019 |
P |
|
4 |
Bid project in April 2008. Construction in July-September 2008. |
|
03/31/08- Pending to issue task order to Architect to re-issue drawings. |
|
|
|
|
|
|
|
420 |
A |
|
March |
| 06380-019 |
Master Consulting Engineers Inc |
D |
670 |
COLISEUM EXTERIOR PAINTING & WATERPROOFING FY06 |
535 - 4 A/N |
42 |
06380-019 |
06380-019 |
P |
|
4 |
Bid project in April 2008. Construction in July-September 2008. |
|
3/31/2008 Pending to issue task
order to Architect to re-issue drawings. |
|
|
|
|
|
|
|
420 |
A |
|
March |
| 06402-017 |
Biltmore Construction |
C |
450000 |
NORTHSHORE POOL SPLASH PAD |
901 Northshore D/NE |
43 |
06402-017 |
06402-017 |
P |
|
4 |
Completed. Follow up on minor
items |
|
3/31/08 HRS to inspect, Biltmore to get C.O. Close out project. |
|
|
|
|
|
|
|
200 |
M |
|
March |
| 07034-110 |
City |
D |
0 |
BAY S/NE ROADWAY RECONSTRUCTION FROM 22 A/NE TO 23 A/NE |
Bay Street N.E. from 22 A/NE to 23 A/NE |
04 |
07034-110 |
07034-110 |
P |
95 |
4 |
04/08 - Prepare 100% Design 05/08
- Prepare Final Bid Documents 05/08 -
Advertise Project |
|
|
|
|
|
|
|
|
|
200 |
M |
D |
March |
| 07035-110 |
City |
D |
0 |
22 A/NE ROADWAY RECONSTRUCTION FROM COFFE POT BLVD TO 1 S/NE |
22 Avenue N.E. form coffee Pot Blvd to First S/N |
04 |
07035-110 |
07035-110 |
P |
95 |
4 |
04/08 - Prepare 100% Design 05/08
- Prepare Final Bid Documents 05/08 -
Advertise Project |
|
|
|
|
|
|
|
|
|
200 |
M |
D |
March |
| 07056-119 |
Vinmar Waterproofing & Concrete Restorat |
C |
26400 |
PIER DOLPHIN PARKING LOT SEAWALL REPAIR |
800 - 2 A/NE |
04 |
07056-119 |
07056-119 |
P |
100 |
4 |
Project Close Out in Progress |
|
|
|
|
|
|
|
|
|
200 |
A |
D |
March |
| 07084-110 |
B & A Contractors, Inc. |
C |
319118 |
PIER PREVENTIVE MAINTENANCE PROGRAM FY 2008 |
800 Second A/NE |
04 |
07084-110 |
07084-110 |
P |
3 |
4 |
4/08 Start construction. |
|
|
|
|
|
|
|
B. Stenfors |
B & A Contractors, Inc. |
200 |
M |
C |
March |
| 07407-019 |
Kone Inc. |
C |
10317.3 |
PIER FACILITY IMPROVEMENTS FY07 |
800 - 2 A/NE |
42 |
07407-019 |
07407-019 |
P |
|
4 |
Award elevator improvements. |
|
03/31/08- Working on bid package for sole source to Kone. Expected to go
to Council for approval in June 2008. Work to
be done in Summer and early Fall of
2008. |
|
|
|
|
|
|
|
200 |
A |
|
March |
| 07413-019 |
City |
D |
0 |
SUNKEN GARDENS PARK IMPROVEMENTS FY07 |
1825 - 4 S/N |
41 |
07413-019 |
07413-019 |
P |
|
4 |
Project to be closed out in May. |
|
3/31/08 Procurement of site furnishings and signage in progress. |
|
|
|
|
|
|
|
200 |
M |
|
March |
| 07417-019 |
West Coast Glass |
C |
90000 |
COLISEUM EXTERIOR DOOR REPLACEMENT FY07 |
535 - 4 A/N |
42 |
07417-019 |
07417-019 |
P |
|
4 |
Transfer funding to another Coliseum project |
|
03/31/08-Determine what funding is left after award of the interior paint
project to determine amount of doors that can be
repaired and/or replaced. |
|
|
|
|
|
|
|
200 |
M |
|
March |
| 07419-019 |
Midway Services |
C |
66815 |
SUNSHINE CENTER HVAC REPLACEMENT |
330 - 5 S/N |
44 |
07419-019 |
07419-019 |
P |
|
4 |
It is anticipated that all reports will be presented by April 4th,2008
any and punch list completed in early April. |
|
3/31/2008 Compressor failed on unit in Bldg #2, contractor replaced same.
T&B was performed on all units. Manufacturer
performed start-up test. |
|
|
|
|
|
|
|
200 |
A |
|
March |
| 08054-119 |
City |
D |
0 |
PIER ROOF TOP UNIT HVAC REBUILD |
800 Second Avenue Northeast |
30 |
08054-119 |
08054-119 |
P |
25 |
4 |
04/08 - Proceed with AC Procurement
05/01/08 - Council approve Procurement
06/08 - Begin Installation |
|
|
|
|
|
|
|
|
|
200 |
M |
D |
March |
| 08210-117 |
Wannemacher Russell Architects, Inc. |
D |
18141 |
RESTROOMS IN PARKS FY08 - NORTHSHORE (KIDS AND KUBS) |
615 - 2 A/NE |
43 |
08210-117 |
08210-117 |
P |
|
4 |
Advertise, award, begin work. |
|
3/31/08 WRA completed plans. Submit to Building Department. Reviewed plan with Parks and Recreation Departments. |
|
|
|
|
|
|
|
420 |
A |
|
March |
| 08211-019 |
City |
D |
0 |
SUNKEN GARDENS IMPROVEMENTS FY08 |
1825 - 4 S/N |
42 |
08211-019 |
08211-019 |
P |
|
4 |
define scope of work and bid jobs |
|
3/31/08 No Change |
|
|
|
|
|
|
|
200 |
M |
|
March |
| 08221-017 |
Nite Owl Irrigation, Inc. |
D |
2676 |
NORTH SHORE POOL IMPROVEMENTS FY08 |
901 Northshore D/NE |
43 |
08221-017 |
08221-017 |
P |
|
4 |
Authorize design services.
Commence design on bleacher cover, order bleachers, relocate building. |
|
3/31/08 Ladelfa to revise task order which will include researching
codes, design and permit, prepare bid package. |
|
|
|
|
|
|
|
200 |
A |
|
March |
| 08223-017 |
City |
D |
0 |
PIER HVAC & PLUMBING |
800 - 2 A/NE |
42 |
08223-017 |
08223-017 |
P |
|
4 |
Define scope of work. |
|
03/31/08 HVAC project transferred to Steve Marshal. Define scope of work
for plumbing repairs. |
|
|
|
|
|
|
|
200 |
M |
|
March |
| 08224-017 |
City |
D |
0 |
PIER ELEVATOR |
800 - 2 A/NE |
42 |
08224-017 |
08224-017 |
P |
|
4 |
Award elevator improvements. Expected to go to Council for approval in
June 2008. Work to be done in Summer and early Fall of 2008. |
|
03/31/08- Working on bid package for sole source to Kone. |
|
|
|
|
|
|
|
200 |
M |
|
March |
| 08225-017 |
City |
D |
0 |
MIRROR LAKE LIBRARY ROOF/WATERPROOFING |
280 - 5 S/N |
40 |
08225-017 |
08225-017 |
P |
|
4 |
Finalize phasing plan and bid documents in April. Confirm scope to be advertised. Advertise in May |
|
3/31/08 Meeting held with consultant to determine ability to further
phase project and reduce cost. |
|
|
|
|
|
|
|
200 |
M |
|
March |
| 08232-018 |
City |
D |
0 |
FIRE STATION #8 REPLACEMENT |
|
40 |
08232-018 |
08232-018 |
P |
|
4 |
Finalize site selection by Fire Department and City Administration. Schedule public input sessions with neighborhood and Friends of Boyd Hill. |
|
3/31/08 developed alternate site plans for final evaluation and approval. |
|
|
|
|
|
|
|
200 |
M |
|
March |
| 08234-017 |
City |
D |
0 |
CRESCENT LAKE PARK IMPROVEMENTS |
1320 - 5 Street North |
43 |
08234-017 |
08234-017 |
P |
|
4 |
|
|
|
|
|
|
|
|
|
|
200 |
M |
|
March |
| 03034-111 |
Advanced Engineering & Design, Inc. |
D |
11300.5 |
PINELLAS BAYWAY FDOT FPID 256903-1-52-02 |
Pinellas Bayway |
18 |
03034-111 |
03034-111 |
P |
100 |
5 |
04/08 - Close Out Project (New Project 08034-111) |
|
January 2004 - Final JPA plans approved by FDOT. May 2004 - Obtained FDOT Right-of-Way permit number 04-H-799-0034 (DOT UTIL - 11C). July 2005 - FDOT to delay the project until
July 2006. Current published FDOT letting date of 2/20/2007. |
|
|
|
|
|
|
|
420 |
A |
D |
March |
| 03100-110 |
City |
D |
0 |
CLAM BAYOU STORMWATER INFRASTRUCTURE IMPROVEMENTS |
Clam Bayou |
18 |