Accessibility Information skip navigation

News Release

Leak from Bleach Containment System Noted at Northwest Reclamation Plant

ST. PETERSBURG, FL (MARCH 16, 2017) – During routine cleaning of a bleach tank at the Northwest Water Reclamation Plant, 7500 26th Ave. N., on Wednesday, March 15, a leak was noted in the containment system. Approximately 30 gallons of diluted bleach leaked from the containment system onto the surrounding asphalt and evaporated, about three gallons went into a storm drain. A sodium sulfite tablet was added to the storm drain to neutralize the chlorine as a precaution. The leak occurred at 8:30 a.m. and ceased at 9 a.m. There was no discharge to surface waters. The containment area is in the process of being repaired.

Print page Text resize: Increase font size Decrease font size Original font size Updated:

City of St. Petersburg
P.O. Box 2842
St. Petersburg, FL 33731

  • p: 727-893-7111
  • f: 727-892-5102
  • tty: 727-892-5259
Copyright City of St. Petersburg St. Pete TV - Off The Air