Project Overview
Due to age of existing infrastructure, a segment of water main within Shore Acres has been identified in need of replacement. The Shore Acres Water Main Replacement Project will be within the existing public rights-of-way along Shore Acres Blvd. and shall include but not be limited to decommissioning of the existing pipes, and replacement of approximately 5000 linear feet of the new 8-inch pipe. Fire hydrants, service connections and existing meters will be connected to the new pipe and surface restoration. Construction methods may include open cut, horizontal directional drilling and pipe bursting, to minimize the potential for traffic disruptions and unnecessary inconveniences during the construction.
Potential Public Impacts
The project limits will be within the existing public rights-of-way along Shore Acres Blvd. NE. (between Overlook Dr. NE. & Approximately 500 feet north of Cason St. NE.).
Potential impacts to the area include:
- Minor traffic impact for a short term along Shore Acres Blvd.
- Minimum impact on asphalt pavement, curbs, sidewalks, and driveways during construction
- Surface and sodding restoration within the impacted areas
- Residences’ access to home will be maintained at all time by the contractor
Project Timeline
Construction is scheduled to begin in the February 2021 and expected to be completed in approximately 8 months.
Public Input Opportunities
Public Meetings
Virtual Public Meeting
Tuesday, Jan. 12, 2021 at 6 p.m.