Wastewater Discharge Notification - 8/14/2022
On Aug. 8, approximately 300 gallons of wastewater were discharged at the 900 block of 1st St. N. The discharge was contained on site.
More at stpete.org/PublicWorksAlerts.
This is an image slider with auto-rotating slides. Activate the bottom stop button to disable rotation. Use Next and Previous buttons to navigate.
On Aug. 8, approximately 300 gallons of wastewater were discharged at the 900 block of 1st St. N. The discharge was contained on site.
More at stpete.org/PublicWorksAlerts.